Welcome to Our Company!
- Unicorp is a Bonafide Qatari Company.
- Unicorp is a merger of leading industrial and infrastructure contracting companies with Expertise in large turnkey EPC projects and large resources .
- The merger brought in Unicorp’s portfolio a Legacy of more than 40 Years of Contracting Experience in the Gulf and Middle East Region.
- In-house Concept and Detailed Design Engineering Capabilities.
- Excellent performance in Health, Safety and Environmental Protection. ISO45001:2018 and ISO14001:2015 Certified company.
- ISO 9001:2015 Certified company, operating under an established Quality Management System.
- Worldwide procurement and sourcing facilities.
- Financing Capabilities for large-scale projects.
- Unicorp retains its core team of professionals & highly specialized staff who have executed its projects in Qatar, Bahrain & KSA
- To provide excellent, world-class Engineering and Contracting services, which:
- Deliver fully accomplished commitments to the satisfaction of our Clients
- Ensure mutually beneficial ventures for our Owners, Partners and Suppliers;
- Foster rewarding efforts and career advancement to our Employees
- Upholds people’s safety, health and the environment; and
- Sustains challenging opportunities for growth within a framework of corporate stability and advancement.
Projects
Ongoing
Project Details:
| Location: | Al Rayan, Qatar |
| Client/Owner: | PWA (Ashgal) |
| Total Amount: | Qr 831,000,000 |
| Organization Type: | Subcontractor |
| Main Contractor: | Qatari Diar / Saudi Binladin Group (QD-SBG) Constructions |
| Project Management: | KBR / Parsons International |
| Start Date: | 1stJanuary 2012 |
| Completion Date: | On-Going |
| Peak Manpower on Site: | 1500 |
- 150mm 800mm dia. UPVC Pipes (1.5m to 5m depth)
- 300mm to 800mm dia. Vitrified Clay Pipes (3m to 6m depth)
- 1000mm to 1400mm dia.GRP Pipes (2.5m to 4.5m depth)
- Cast in situ Concrete manholes, catch basins, gullies (1.5m to 6m depth)
- 200mm to 400mm dia. Vitrified Clay Pipes (2m to 5.5m depth)
- Shallow to very deep cast in situ Concrete manholes (2m to 9m depth)
- Microtunneling (800mm to 1100mm dia. GRP lined concrete jacking pipes, depth from 6.5 to 8.8m (@750m length)
- Removal of cancelled foul sewer lines
- DI pipes 100mm to 1400mm dia. Including fittings
- Valves and fire hydrants
- Flow meter chambers
- Removal of cancelled pipe works
- 11kV Cables
- 14kV Cables
- 66kV Cables
- 220kv Cables
- MV/LV cables (4C/2C)
- Road crossing ducts
- Removal of existing dead cables
- Demolition of existing Substations (5 Nos.)
- Construction of indoor type substations (3 Nos.)
- Construction of outdoor type substations (3 Nos.)
- Construction of package type substation (1 No.)
- Ducts
- Columns and brackets
- Feeder pillars
- Earthing
- Underpass, Tunnel and bridge lighting
- Construction of Qtel Ducts (materials to be provided by Qtel)
- Manholes and joint boxes
- Removal of cancelled Qtel ducts, overhead lines and existing telephone posts and poles, kiosks and cabinets.
- Removal of cancelled manholes and chambers
- 400mm to 700mm dia. DI Pipes and fittings (1.5m to 6.5m depth)
- 250mm dia. HDPE Pipes (1.5m to 5.5m depth)
- Valves and valve chambers (2m to 7m depth)
- Ducts
- Manholes and chambers
- Cables
- Signal work foundations
- Traffic Controllers
- Signal posts, poles, signs,
- Signal heads, arrows and signs
- Earting system
- Vehicle loop detector system
Completed
Project Details:
| Location: | Qatar Foundation |
| Client/Owner: | QF/Astad |
| Total Amount: | QR 390 Million |
| Type of Contract: | Procurement & Construction |
| Organization Type: | Main Contractor |
| Project Management: | Astad/Parsons |
| Start Date: | Oct 2010 |
| Completion Date: | Mar 2015 |
| Peak Manpower on Site | 600 |
SCOPE OF WORKS:
The scope of work includes procurement, construction, commissioning, O&M, training of QF Staff and handover of Central Plant with cooling capacity of 32,000 TR. CP7 occupies a building foot print of approx. 11,052 m2 with a basement level for chiller plants, distribution pumps and water storage tanks, approx. 8.5m deep.
The maximum height of the exterior cladding is approx. 16m. The CP is to include new perimeter roads.
The work includes but is not limited to:
- All related civil construction works, tanking and architectural finishes, including procurement and fixing / installation of required accessories.
The civil construction of below ground reservoirs and Pump Room at the Basement level of the CP, comprising Substructure (Reservoirs and Pump Room), and Superstructure (Control Room, Loading Bay, Workshop, Storeroom, Fan Room, Office and Ablution Room).
- HVAC works, plumbing works, mechanical works, electrical works, fire alarm system, fire fighting system, chilled water system within the CP's (excluding the supply of chillers).
- Security System, Earthing and Lightning protection System, SCADA control system.
- Mechanical equipment for Reservoirs and Pump Rooms, including, but not limited to, irrigation pumps, fire pumps, make-up water pumps, filter pumps, filters, water treatment dosing systems, potable water pumps, sump pumps, supply/discharge and interconnecting piping, valves, appurtenances, controls, and associated ancillaries.
- HVAC equipment for Pump Rooms, including, but not limited to, package air conditioning unit, exhaust fans, air cooled condensing units, fan coil units, pipes, ducts, with associated valves, appurtenances, controls and associated ancillaries.
- Electrical instrumentation and control related equipment for Reservoir and Pump Station, including, but not limited to, MCC panels, instruments, cable trays/ conduits for the LV electrical distribution for lighting, ventilation, fire alarm system, trays/conduits for laying low voltage communication and data transfer cables.
- Fire Alarm System for Pump Room, including, but not limited to, appurtenances, hose boxes, fire extinguishers and other associated ancillaries;
- Access Hatches and Doors, all metal works accessories.
Our Projects



